How Much Does Concrete Driveway Cost in Cedar Rapids, IA?

2026 local pricing guide for concrete driveway in Cedar Rapids, IA with cost breakdowns and provider data.

Cedar Rapids, IA Average

$2,550$5,950

Most homeowners pay around $4,250

Low

$2,550

Typical

$4,250

High

$5,950

Based on national averages adjusted for IA cost of living (-15% vs. national average).

18

Licensed Providers in Cedar Rapids

N/A

Avg Rating

0

Total Reviews

Get Quotes from 18 Licensed Concrete Driveway Pros in Cedar Rapids

Compare ratings, read reviews, and request a quote

Concrete Driveway Cost Breakdown in Cedar Rapids, IA

Project TypeLowTypicalHigh
Standard Concrete Driveway$2,550$4,250$6,375
Stamped/Decorative Concrete$4,250$6,800$10,200
Asphalt Driveway$1,700$2,975$4,250
Paver Driveway$4,250$7,650$12,750
Driveway Resurfacing$850$2,125$4,250
Driveway Repair (per section)$255$680$1,700

Prices adjusted for Cedar Rapids, IA cost of living. Actual costs may vary. Get multiple quotes for accurate pricing.

Factors That Affect Concrete Driveway Cost in Cedar Rapids

Frequently Asked Questions

How much does concrete driveway cost in Cedar Rapids, IA?

Concrete Driveway in Cedar Rapids, IA typically costs $2,550 to $5,950, with most homeowners paying around $4,250. Costs vary based on project scope, materials, and the contractor you hire.

How many concrete driveway providers are in Cedar Rapids?

There are 18 verified concrete driveway providers in Cedar Rapids, IA. We recommend getting quotes from at least 3 providers.

How much does a concrete driveway cost per square foot?

A standard concrete driveway costs $6 to $12 per square foot. Stamped or decorative concrete runs $10 to $18 per square foot. The average two-car driveway is 400-600 square feet.

How long does a concrete driveway last?

A properly installed concrete driveway lasts 25 to 30 years or more. Sealing it every 2 to 3 years extends its life and prevents cracking.

How long before you can drive on new concrete?

Light foot traffic is safe after 24 to 48 hours. You can drive on it after 7 days. Heavy vehicles should wait 28 days for full cure.

Concrete Driveway Cost in Nearby Cities

Related Cost Guides for Cedar Rapids, IA

Fence Installation

$2,125 - $6,800

Landscaping

$2,550 - $12,750

Exterior Painting

$2,550 - $5,950

Ready to get started?

Compare quotes from top-rated concrete driveway professionals in Cedar Rapids, IA.

Browse 18 Providers in Cedar Rapids
Concrete Driveway Cost (National)All Cost Guides